Info Report Check
Submission incomplete:
1: The DOE shall explain how it has verified the meters calibration details (and any corresponding adjustments in the ER spreadsheet) considering that the first calibration date/certification mentioned in Annex 1 in the Monitoring Report v1.2 and p.26 in the Verification Report v03 is "11/06/2014" (Set 1 meters), whereas the monitoring period starts on 06/01/2014. It is not clear how the DOE has assessed the validity of calibration of instruments used in conformity with the requirements as the delay in calibration was applied only for the apportioning procedures for the month of January 2014.
Refer to VVS v3.0 paras 365, 366 and 367

2: The DOE shall explain how it has verified the emissions reductions calculations in line with the requirements. The value of "TEGy" for the month of July 2014 was typed in the ER spreadsheet submitted (cell B10 in the worksheet "Gen Data") instead of being calculated. The DOE shall explain how it has assessed the applied calculations and results based on actual measured electricity generation data.
Please refer to VVS v3.0 paras 372, 374 (b) (c)