Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVS v7 para 278)
Issue:
The verification report does not provide sufficient information on how value of the EGy (Quantity of net electricity exported to the grid during period y) has been verified. It is observed that:
(1) As per the page10 of the monitoring report the EGy has been monitored by the meters located at WTG (Controller meter, line diagram in the page 8 of the monitoring report); however, section B.7.1 of the registered PDD requires that the EGy is based on readings through the main meter.
(2) The values “partial days of generation as per generation report” in the Apportioning spreadsheet have been used to calculate the EGy; however it found that this value (for example the cell J13) has been calculated based on the values generated in the generation report/invoice (for example the cell J10 of Apportioning spreadsheet) which have been apportioned based on the values monitored from the controller meters (for example the cell J8 of Apportioning spreadsheet). It notes that as per section B.7.1 QA/QC procedures of the registered PDD, invoices are to be used for cross checked and EGy is based on readings through the main meter.
(3) PP and DOE have provided relevant calibration information with regard to those six controller meters located at WTGs; however, relevant main meter calibration information has not yet provided.