19:42 09 Jul 25
Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: The DOE shall explain why the CL 01 has been closed considering the meter (M5) used to monitor electricity imports from the grid for residual area and emergency was not included in the monitoring plan of the registered PDD, in line with VVM paragraph 204 and 206. Also, please further explain the term used 'residual area' and the reference to the 'emergency event'.
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: The DOE shall explain why the CL 01 has been closed considering the meter (M5) used to monitor electricity imports from the grid for residual area and emergency was not included in the monitoring plan of the registered PDD, in line with VVM paragraph 204 and 206. Also, please further explain the term used 'residual area' and the reference to the 'emergency event'.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: