Info Report Check
Submission incomplete:
1:
The monitoring report specifies that the accuracy of the flow meter (FIT-9611) ±0.5% , used for measuring parameter EGthermal,y is different from the value of ±0.25% described in the monitoring plan of the registered PDD. The PP shall provide more information on how it considered this change as a temporary deviation and not a permanent change from the monitoring plan.

2:
The validation opinion does not clearly mention the monitoring period to which the deviation is applicable. The DOE shall provide more information why they have considered this Post Registration Change as a temporary deviation.

3:
The monitoring report specifies that a temporary deviation is requested from the monitoring plan as the accuracy of ±0.5% for the flow meter installed for measuring thermal energy generated is different from the accuracy value of ±0.25% specified in the PDD. The PP has applied a factor of -0.25% to the measured value of EGthermal, though the calibration of meter identifies the maximum accuracy as 0.36%. The PP/DOE shall provide more information why they considered applying a factor of -0.25% to the parameter is conservative as required by paragraph 240 of the CDM Project Standard for project activities version 01.0.