Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The monitoring report does not contain information regarding the national regulations applicable for the calibration frequency of the electricity meter as required by the revised monitoring plan.
2: Scope: The spreadsheet does not contain the formulae of calculation that are shown in the spreadsheet cells whenever possible. (EB48 - Annex 68 paragraph 10 (b) (ii)).
Issue: The submitted spreadsheet does not contain the FOD model calculations for estimating the amount of baseline emissions from the biomass that would have been decayed in absence of the project activity.
3: Scope: The verification report does not list each parameter required by the monitoring plan (VVM v.1.2 para 206)
Issue: The verification report does not contain information regarding the following monitoring parameters
(i) Total organic carbon
(ii) Distance (between biomass and landfill and between biomass and project)
(iii) Biomqass Survey
(iv) Landfill gas collection occurs on the landfill near the project
4: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The verification report does not confirm that the calibration of the electricity meter complies with national standards as required by the revised monitoring plan.
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The monitoring report does not contain information regarding the national regulations applicable for the calibration frequency of the electricity meter as required by the revised monitoring plan.
2: Scope: The spreadsheet does not contain the formulae of calculation that are shown in the spreadsheet cells whenever possible. (EB48 - Annex 68 paragraph 10 (b) (ii)).
Issue: The submitted spreadsheet does not contain the FOD model calculations for estimating the amount of baseline emissions from the biomass that would have been decayed in absence of the project activity.
3: Scope: The verification report does not list each parameter required by the monitoring plan (VVM v.1.2 para 206)
Issue: The verification report does not contain information regarding the following monitoring parameters
(i) Total organic carbon
(ii) Distance (between biomass and landfill and between biomass and project)
(iii) Biomqass Survey
(iv) Landfill gas collection occurs on the landfill near the project
4: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: The verification report does not confirm that the calibration of the electricity meter complies with national standards as required by the revised monitoring plan.