00:44 22 Nov 24
Info Report Check
Submission incomplete:
Refer to paragraph 365 of VVS-PA:
As per the registered PDD and the monitoring report, the WEG controllers used for the measurement of Gross electricity generated by all WEGs connected to substation and Gross electricity generated by all WEGs owned by PP in project activity shall be tested for accuracy once in three years. However, no details have been provided on the same by the DOE in the verification report on the conduct of the test which covers this monitoring period. The DOE is therefore requested to clarify how it has verified that the testing of WEG controllers was conducted as per the requirements specified in the registered monitoring plan.
Refer to paragraph 365 of VVS-PA:
As per the registered PDD and the monitoring report, the WEG controllers used for the measurement of Gross electricity generated by all WEGs connected to substation and Gross electricity generated by all WEGs owned by PP in project activity shall be tested for accuracy once in three years. However, no details have been provided on the same by the DOE in the verification report on the conduct of the test which covers this monitoring period. The DOE is therefore requested to clarify how it has verified that the testing of WEG controllers was conducted as per the requirements specified in the registered monitoring plan.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: