Info Report Check
Submission incomplete:
Scope: The verification and certification report does not provide a conclusion on the verified amount of emission reductions achieved nor/or confirm that appropriate methods and formulae for calculating baseline emissions, project emissions and leakage have been followed as per VVS version 09.0 paragraphs 403 (c) and 409 (j).
Issue: The DOE is requested to explain how it has verified the correctness of apportioning calculation for parameter EGexport,PP in the spreadsheet for period 02 Jan 2013 to 31 Jan 2013 (cell C8 of sheet "CER Calculation").