Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVS v2 para 235)
Issue: The monitoring plan requires the accuracy of M7 and M8 complies with the relevant regulation of Lao PDR. The DOE is requested to further substantiate how the meter accuracy of 1.0 (meter M7) and 2.0 (meter M8) complies with the regulation of Lao PDR.