Submission incomplete:
PS-PA Para 260 (b) and VVS-PA Para 361(e):
(a) Figure 4 on page 14 of the Monitoring report shows the installation of one meter between Zambrano substation and Gualaca substation. However, there is no information provided in the monitoring report and verification report regarding this meter. The PP is requested to provide information on this meter in the monitoring report as required by paragraph 260 (b) of PS-PA, version 03.0 and DOE shall explain how it verified this meter in the verification report;
(b) Page 22 of the monitoring report states that parameter EGfacility,y is measured continuously and recorded monthly. However, as per section E.6.2, page 13 of the verification report, EGfacility,y is continuously read, measured and recorded every 15 minutes automatically by two electricity meters in the Guasquitas Substation. The DOE is requested to address on this inconsistency.