Info Report Check
Submission incomplete:
Scope: The monitoring report does not contain calculations of baseline emissions, project emissions, leakage (if any), and emission reductions, including reference to formulae and methods used as per PS version 09.0 paragraph 253.
Issue: There is an inconsistency of the CER between the monitoring report/verification/certification report (460,312 CO2) and the signed form/project view page/MR12 summarized - LLC - V.3 spreadsheet (470,616 CO2).