Info Report Check
Submission incomplete:
1: VVS-PA Para 373(b)
As per the registered PDD, EGexport,y shall be cross-checked with sales receipts. As per the ER spreadsheet, the data has been captured from the log sheets. DOE shall clarify how it cross-checked that the data in the log sheet is conservative considering there is no reference of cross-check with the sales receipt in the verification report. Refer Para 373(b) of VVS-PA, version 3.0.

2: VVS-PA Para 373(c)
2. As per page 49 of the registered PDD, fcap was considered as 1 for ex-ante calculations but same shall be calculated using actual values of quantity of waste gas used for energy generation during the year in Nm3 by flow meter. As per the submitted ER spreadsheet for the monitoring period, fcap has been taken as 1. The DOE shall clarify how it confirmed that fcap has been calculated as per the registered PDD as no calculations have been provided in the monitoring report or the ER spreadsheet. Refer Para 373(c) of VVS-PA.