1: Scope: The monitoring report does not contain emission factors, IPCC default values, and/or other reference values used in the calculation of emission reductions. (EB48 - Annex 68 paragraph 10 (a) (v)).
Issue:The reported value for AFRmax (Maximum Ammonia Gas flow rate to the ammonia oxidation reactor) in the monitoring report (page 14) is 2008 tNH3/h whereas 2008 kg NH3/h in calculation sheet. Please rectify the inconsistency on the reported values for AFRmax.
2: Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:The DOE is requested to provide verified information on the events and incidents related to the production and/or monitoring (such as plant shutdown, AMS down time) during the project campaign. If there were any plant and AMS downtime, information should be provided on how it was handled as per AM0034 requirements.
3: Scope: The verification report does not provide a conclusion on the verified amount of emission reductions achieved and/or determine that calculations of baseline emissions, project emissions and leakage as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
Issue:Information related to the calculation of EFma in accordance with the formulae and methods described in the monitoring plan and the applied methodology document should be reported, considering that the previous project campaign emission factor ( 3rd request for issuance) has not yet been approved by the EB.
4: Scope: The verification report does not determine if the assumptions used in emission calculations have been justified and/or emission factors, default values and other reference values have been correctly applied. (VVM v.1.2 para 208 (d) & (e))
Issue:The DOE must report all the data and parameters used in emission calculation, including verified default values, factors, assumptions and baseline campaign related data.
1: Scope: The monitoring report does not contain emission factors, IPCC default values, and/or other reference values used in the calculation of emission reductions. (EB48 - Annex 68 paragraph 10 (a) (v)).
Issue:The reported value for AFRmax (Maximum Ammonia Gas flow rate to the ammonia oxidation reactor) in the monitoring report (page 14) is 2008 tNH3/h whereas 2008 kg NH3/h in calculation sheet. Please rectify the inconsistency on the reported values for AFRmax.
2: Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue:The DOE is requested to provide verified information on the events and incidents related to the production and/or monitoring (such as plant shutdown, AMS down time) during the project campaign. If there were any plant and AMS downtime, information should be provided on how it was handled as per AM0034 requirements.
3: Scope: The verification report does not provide a conclusion on the verified amount of emission reductions achieved and/or determine that calculations of baseline emissions, project emissions and leakage as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
Issue:Information related to the calculation of EFma in accordance with the formulae and methods described in the monitoring plan and the applied methodology document should be reported, considering that the previous project campaign emission factor ( 3rd request for issuance) has not yet been approved by the EB.
4: Scope: The verification report does not determine if the assumptions used in emission calculations have been justified and/or emission factors, default values and other reference values have been correctly applied. (VVM v.1.2 para 208 (d) & (e))
Issue:The DOE must report all the data and parameters used in emission calculation, including verified default values, factors, assumptions and baseline campaign related data.