Info Report Check
Submission incomplete:
1: Scope: The spreadsheet does not contain all parameters required to be monitored and/or reported at the intervals required by the monitoring plan and the applied methodology?
Issue: The spreadsheet does not provide information regarding the temperature of the flares as required by paragraph 38 of the applied methodology AMS III.H Version 09, if default flare efficiency of 50% is used for the calculations.

2: Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The DOE shall provide more information how it verified that the temperature of the flare as required by paragraph 38 of the applied methodology AMS III.H version 09 is monitored.