Info Report Check
Submission incomplete:
1: Scope: The verification report does not confirm that the error has been applied in a conservative manner, such that the adjusted measured values of the delayed calibration shall result in fewer claimed emission reductions; (VVS v3, para 239(a))
Issue: It has been noted that "Due to calibration delay, S-301 data from 01/01/2009–16/02/2009 and 07/01/2012–12/01/2012 was adjusted by maximum error of 3% as per EB52, Annex 60". However, the applied adjustment does not result in fewer claimed emission reductions, noting that the S_LP inflates due to the adjustment of S_HP. The DOE is requested to clarify how it has verified the adjustment of delayed calibration to flow meters for SHP in line with VVS version 3.0 paragraph 239.

2: Scope: The verification report does not provide the description of how the DOE cross-checked reported data (VVS v3, para 246 (b))
Issue: The DOE is requested to provide the information on how it has cross checked the material and energy balance as required by the approved revised monitoring plan (page 39 of the revised PDD version 6.1.0).