Submission incomplete:
1: By means of an on-site inspection or other means of verification in accordance with paragraph 339 or 340 above, the DOE shall assess that all physical features (technology, project equipment, and monitoring and metering equipment) of the registered CDM project activity specified in the registered PDD are in place and that the project participants have operated the project activity as per the registered PDD or any approved revised PDD (paragraph 355 of VVS for PA version 2).
The DOE states (p 6) that "The commission date of the Solar Power plant was verified from the commissioning certificates and found that project was commissioned on 31/03/2017." However, 1) the monitoring report indicates that the commissioning dates were in December 2017 and 2) and the spreadsheet indicates that there was no electricity generation in November 2017. Therefore, the DOE is required to provide further information on how it verified the commencement of the project activity.

2: The DOE shall take due account of all authentic and relevant comments in the verification for the first request for issuance of CERs (paragraph 392 of VVS for PA version 2)
The DOE did not provide any information in the section E.10 of Global stakeholder consultation in the verification while this request is the first request for issuance.