Submission incomplete:
1: Scope: The validation report does not contain an assessment on when the changes occurred, reasons for those changes taking place, whether the changes would have been known prior to registration of the project activity, and how the changes would impact the overall operation/ability of the project activity to deliver emission reductions as stated in the PDD as per VVS version 09.0 paragraph 326 (b).
Issue: Regarding the change in the reservoir volume from 50,000 to 53,463 m3, the DOE states that "the power density remains far below the 4W/m2." The DOE is requested to provide further information as per para 4 of the applied methodology (AMS-I.D version 17).
2: Scope: The spreadsheet does not contain explanation with regard to application of formulae in the spreadsheet.
Issue: The spreadsheet called "ACT summary" provides the monthly meter readings and invoice. From May to September 2014, the values in the invoice are higher than the net electricity generation based on the meter readings (for example, P1 reading +P2 reading -P3 reading).The PP/DOE is required to provide the explanation.
1: Scope: The validation report does not contain an assessment on when the changes occurred, reasons for those changes taking place, whether the changes would have been known prior to registration of the project activity, and how the changes would impact the overall operation/ability of the project activity to deliver emission reductions as stated in the PDD as per VVS version 09.0 paragraph 326 (b).
Issue: Regarding the change in the reservoir volume from 50,000 to 53,463 m3, the DOE states that "the power density remains far below the 4W/m2." The DOE is requested to provide further information as per para 4 of the applied methodology (AMS-I.D version 17).
2: Scope: The spreadsheet does not contain explanation with regard to application of formulae in the spreadsheet.
Issue: The spreadsheet called "ACT summary" provides the monthly meter readings and invoice. From May to September 2014, the values in the invoice are higher than the net electricity generation based on the meter readings (for example, P1 reading +P2 reading -P3 reading).The PP/DOE is required to provide the explanation.