Info Report Check
Submission incomplete:
Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue 1: The DOE has not reported how it has assessed that the project participant was able to visit 17,000 householders in a period of 30 days with 6 people in a geographical area of 1,365 Km2 resulting in 100% of solar cookers properly working since the starting date of the crediting period.
Issue 2: The DOE used the accumulated operating hours data (309 samples) in order to determine the number of on-site sample size for another parameter (the number of solar cookers operating). Additional information is required on how the DOE has determined the sample size for its own on-site check of the number of solar cookers operational as per EB65 Annex 2 paragraph 24 guidance.