1: Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue:The registered monitoring plan (page 31 of the PDD) states that the accuracy class of the main meter M1 is of 0.5s class. However, the project has been continuously using 0.2s meters. Information shall be provided as to why a request for revision of monitoring plan was not submitted to reflect the actual monitoring.
2: Scope: The verification report does not list each parameter required by the monitoring plan (VVM v.1.2 para 206)
Issue:The PDD (page 28) requires that the "surface area at full reservoir level" be "measured" and this parameter is listed as a monitoring parameter. However, the Verification Report states (page 24) that this is determined at the start of the project activity. Since this is no longer a parameter required to be measured, information shall be provided as to why a request for revision of monitoring plan was not submitted to reflect the actual monitoring.
1: Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue:The registered monitoring plan (page 31 of the PDD) states that the accuracy class of the main meter M1 is of 0.5s class. However, the project has been continuously using 0.2s meters. Information shall be provided as to why a request for revision of monitoring plan was not submitted to reflect the actual monitoring.
2: Scope: The verification report does not list each parameter required by the monitoring plan (VVM v.1.2 para 206)
Issue:The PDD (page 28) requires that the "surface area at full reservoir level" be "measured" and this parameter is listed as a monitoring parameter. However, the Verification Report states (page 24) that this is determined at the start of the project activity. Since this is no longer a parameter required to be measured, information shall be provided as to why a request for revision of monitoring plan was not submitted to reflect the actual monitoring.