Info Report Check
Submission incomplete:
As per VVS 3.0, para 360, The DOE shall determine whether the monitoring of parameters related to GHG emission reductions or net anthropogenic GHG removals in the registered PDD has been implemented in accordance with the registered monitoring plan:
As per the monitoring plan, main and check meters are installed at Pacchapur feeder to record net electricity supplied to the grid for 5 WTGs of project activity, and the main meter readings in the joint meter reading (JMR) report are the basis for the emission reductions calculation. The monitoring report shows that there are one main meter and one check meter to measure parameters EGexport, y and EGimport,y which are used to calculate net electricity supplied to the grid. However, the emission reductions (ER) spreadsheet shows that the PP has values of EGexport, y and EGimport,y for each WTG. The DOE is requested to explain how the monitoring plan has been complied with. In doing so, the DOE/PP shall also: (i) Explain whether the values for EGexport,y and EGimport,y for each WTG shown in the ER spreadsheet are readings from the main meter; (ii) If they are, explain how there are separate values for EGexport,y and EGimport,y for each WTG from readings of one main meter; (iii) Clarify whether meter(s) measuring EGimport,y is installed at the feeder or the project plant, considering page 13 of verification report states that energy imported is monitored through energy meters installed at the plant; (iv) Provide monitoring diagram which shows all the meters involved in the measurement of EGexport,y and EGimport,y if there are meters other than one main meter and one check meter that are described in the monitoring report.