Submission incomplete:
1: The revised IRR calculation spreadsheet has not been submitted as per the requirements of PS-PA, v.03.0 para. 221.
2: Section E.3 of the Verification Report states that the commercial operation of the project activity had been started on 03/01/2013, which was verified vide commissioning certificates. However, emission reductions are claimed from December 2012 onwards. Clarification is sought in line with the requirements of para. 321 of the VVS, v.03.0.
3: A remote site inspection mentioned in the verification report sections D.2, E8.2 and E8.3 was conducted on 12/10/2022. However, as per para. 339-a of the VVS, v.03.0 it is mandatory for the DOE to conduct an on site inspection if It is the first verification for the DOE with regard to this project activity.
1: The revised IRR calculation spreadsheet has not been submitted as per the requirements of PS-PA, v.03.0 para. 221.
2: Section E.3 of the Verification Report states that the commercial operation of the project activity had been started on 03/01/2013, which was verified vide commissioning certificates. However, emission reductions are claimed from December 2012 onwards. Clarification is sought in line with the requirements of para. 321 of the VVS, v.03.0.
3: A remote site inspection mentioned in the verification report sections D.2, E8.2 and E8.3 was conducted on 12/10/2022. However, as per para. 339-a of the VVS, v.03.0 it is mandatory for the DOE to conduct an on site inspection if It is the first verification for the DOE with regard to this project activity.