Submission incomplete:
1: VVS-PA, para 360, and PS-PA, para 258:
As per page 10 of the monitoring report, for Karnataka, the power generated by wind mills is measured using WTG meter (main meter and check meter) at the project site, and net electricity exported to the grid by the wind farm is measured using meters installed at the substation (one main and one check meter). The table on pages 10 and 11 lists the serial number of meters for Karnataka site. However, the table is not clear which meters are WTG meters and which meters are meters at the substation. The DOE is requested to: (a) clarify which meters are WTG meters and which meters are meters at the substation; (b) provide line diagram (graphical schemes) which shows the location of all meters used for monitoring.

2: VVS-PA, para 365:
As per the monitoring plan, calibration of WTG meters and substation meters in Maharashtra will be carried on an annual basis. However, calibration details of WTG meters have not been provided in the monitoring report or the verification report. The DOE is therefore requested to: (a) Explain how the calibration of WTG meters have been carried out as per the monitoring plan; (ii) Provide calibration details of WTG meters in the monitoring report and verification report.