Info Report Check
Submission incomplete:
1: Paragraphs 303(a) and 304(a) of VVS-PA:
The DOE is requested how it concluded that the change to the project design does not adversely impact the additionality of the project activity based on the fact that the total capacity remains below 10 MW, considering that the additionality of the project activity during the registration was demonstrated using investment analysis.

2: Paragraph 355 of VVS-PA:
There is no info how the DOE verified the methane capture system, particularly the wells and piping system.

3: Paragraph 260(b) of PS and paragraphs 365-366 of VVS-PA:
The DOE stated that there were delayed calibrations for thermal flow meter (Serial # 411850) and temperature meter (Serial # 1511891776), and the rule from paragraph 366 (a) of VVS-PA has been applied as the results of the delayed calibration do not show any errors in the measuring equipment. However, there is no information of: (i) Any calibration of this thermal flow meter, including when delayed calibration was conducted; (ii) The date of the delayed calibration of this temperature meter.