Info Report Check
Submission incomplete:
1: Scope: The verification report does not state how the DOE verified the information flow for the listed parameters. (VVM v.1.2 para 206)
Issue:The Verification report states that for the monitoring period under consideration meters have been changed for the following parameters:EG_GENCPP, EG_AUXCPP, T_WHR-2, T_WHR-1, P_FBC and was found as a part of the internal audit. However the DOE is requested to provide further information on the
1. Reason for change of meters and impact of this change .
2. QA/QC procedures followed to ensure that the monitoring parameters have been correctly monitored during this time period .

2: Scope: The verification report does not provide a conclusion on the verified amount of emission reductions achieved and/or determine that calculations of baseline emissions, project emissions and leakage as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
Verification Report (Chapter 4) points out the differences between the reported values and the verified values. The DOE is requested to provide further information on the reason for the significant differences in the values of the parameters : H WHR-1,H WHR-2 and H FBC between the reported and the verified values.