Info Report Check
Submission incomplete:
Scope: The monitoring report does not contain a description of the nature, extend and duration of the non-conforming monitoring and the proposed alternative monitoring of the project activity (PS v1 para 206)
Issue: The monitoring report, page 4 states that "It is proposed that the maximum value (100%) during this monitoring period operational under normal conditions, which is higher than the average calculated value (62.55%), is applied to the 4 days for which this deviation is proposed. By applying the high value instead of the average, the project emission have increased slightly, reducing the overall emission reductions claimed hence it is considered a conservative approach and the deviation request deemed reasonable. However, the monitoring report and verification report do not contain a description on how the deviation was applied in the calculation of MDy (Methane captured and destroyed/gainfully used by the project activity) as it can be observed in the submitted CER spreadsheet, for 9-12 February.
Scope: The monitoring report does not contain a description of the nature, extend and duration of the non-conforming monitoring and the proposed alternative monitoring of the project activity (PS v1 para 206)
Issue: The monitoring report, page 4 states that "It is proposed that the maximum value (100%) during this monitoring period operational under normal conditions, which is higher than the average calculated value (62.55%), is applied to the 4 days for which this deviation is proposed. By applying the high value instead of the average, the project emission have increased slightly, reducing the overall emission reductions claimed hence it is considered a conservative approach and the deviation request deemed reasonable. However, the monitoring report and verification report do not contain a description on how the deviation was applied in the calculation of MDy (Methane captured and destroyed/gainfully used by the project activity) as it can be observed in the submitted CER spreadsheet, for 9-12 February.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: