Info Report Check
Submission incomplete:
1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue: The calibration details for the monitoring equipments are available in section B.1.2 of the MR along with meter number, calibration due date and location. However, the actual calibration date for monitoring equipments is not mentioned in the MR.

2: Scope: The verification report does not describe the reasons for the phased-implementation delay and/or does not present the expected implementation dates. (VVM v.1.2 para 198 (a)).
Issue: There are 2 anaerobic lagoons and the project participant had planned to cover both the anaerobic lagoons during the first crediting period however, currently one anaerobic lagoon has been covered.
The utilization of the methane captured for renewable energy has not been implemented yet. DOE has not described the reason for delay in full implementation of the project activity as described in the PDD and has not presented the expected implementation dates.