Info Report Check
Submission incomplete:
The para 342 of VVS for PA version 2 provides the requirement for the mandatory on-site inspection at verification and the para 26 of EB 106 meeting report requires the DOE to provide a proper justification if the site visits cannot be postponed.
1) The verification report (p 6) provided the justification to the requirement for the mandatory on-site inspection against the para 29(b) and para 30 which is for for the validation of the project activity. The DOE is required to provide its verification opinion against the correct requirement of the VVS for the verification ; and
2) The verification report (p 6) states that "In accordance with the above mentioned requirement, for this project activity, KBS has made commitment/timeline as per the validation contract. Hence, the site visit cannot be postponed for this PA." The DOE is requested to provide further information on the proper justification considering that the verification report referred to the validation contract.