Submission incomplete:
1: Scope: The revised PDD does not contain a description of the nature and extent of the proposed or actual changes to the project design of a registered project activity (PS v1, para 218 (a)(b)(c)(d)(e)
Issue: The following changes from the project design in the registered PDD are observed: i) installation of an additional train, i.e. Train 6; ii) reduction of the Water Reclamation Plants supplying sludge to the project from 6 to 4; and iii) operational parameters relevant to the volume of dried sludge and wet sludge, the characteristics of the sludge, the N2O emissions and the residual carbon in ash. However, a revised PDD which describes the nature and extent of the changes is not prepared by the project participants, as per requirement of paragraph 221 of the CDM Project Standard version 2.1.

2: Scope: The verification report does not provide a description of the actual operation of the project activity (VVS v2, para 228 (b))
Issue: The verification report does not provide information on the several operational issues and changes described at pages 7 amd 8 of the Monitoring Report.