06:43 20 Nov 24
Info Report Check
Submission incomplete:
The DOE has verified the number of SAVE80 systems in use for the 9th monitoring period of 01 Jul 18 - 30 Jun 19 as 3,861.85 based on the drop-out rate (8.35%) for the 8th monitoring period and the drop-out rate (11.83%) for the 9th monitoring period. During the 10th monitoring period (01 Jul 19 - 11 Oct 19), the DOE has verified the number of SAVE80 systems in use as 4,017.93 based on the drop-out rate (8.35%) for the 8th monitoring period and the drop-out rate (8.27%) for the 10th monitoring period by stating that “Since, for both 9th and 10th the monitoring period, PP have conducted the monitoring activity simultaneously, the consideration of resultant operational stoves (Ny,i) value of 4,379.95 as the basis for the both (9th and 10th) monitoring period is found appropriate.” The DOE is required to provide further clarification on how it has verified the increase in the number of system from the 9th to the 10th monitoring period considering that the DOE states in CL2 that “no new stoves have been implemented in the project since June 2015.”
The DOE has verified the number of SAVE80 systems in use for the 9th monitoring period of 01 Jul 18 - 30 Jun 19 as 3,861.85 based on the drop-out rate (8.35%) for the 8th monitoring period and the drop-out rate (11.83%) for the 9th monitoring period. During the 10th monitoring period (01 Jul 19 - 11 Oct 19), the DOE has verified the number of SAVE80 systems in use as 4,017.93 based on the drop-out rate (8.35%) for the 8th monitoring period and the drop-out rate (8.27%) for the 10th monitoring period by stating that “Since, for both 9th and 10th the monitoring period, PP have conducted the monitoring activity simultaneously, the consideration of resultant operational stoves (Ny,i) value of 4,379.95 as the basis for the both (9th and 10th) monitoring period is found appropriate.” The DOE is required to provide further clarification on how it has verified the increase in the number of system from the 9th to the 10th monitoring period considering that the DOE states in CL2 that “no new stoves have been implemented in the project since June 2015.”
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: