18:09 24 Nov 24
Info Report Check
Submission incomplete:
1: The revised PDD in this submission and the revised PDD of the previous submission indicate the same completion date (i.e.01/07/2019) whereas different version number (2.4 vs 2.2) and different content (80 pages vs 94 pages). The DOE is requested to address the inconsistency and submitted the valid revised PDD with correct version number and completion date.
2: Page 32 (i.e. section 2.2 of the monitoring methodology) of AR-ACM0001 / Version 03 requires the targeted precision level for biomass estimation within each stratum is ±10% of the mean. However, the achieved precision of each stratum is not calculated and reported separately. The DOE is requested to provide information how it has verified the actual precision of each stratum.
3: Page 5 and page 32 of the applied methodology (AR-ACM0001 version 03) requires ex-post update of stratification due to forest management activities (e.g. harvesting). The updated planting/harvesting cycle (i.e. table 4 of the revised PDD) shows harvesting activities since 2015, and the verification report confirms the same. However, the verification report does not provide information on how those harvesting activities have been considered in ex-post stratification in line with the methodology requirements.
4: The spreadsheet containing information on how the tree biomass of the sampled plots was derived are NOT submitted. The DOE is requested to submit these spreadsheets and provide information on how it has verified the correctness of the tree biomass calculation.
1: The revised PDD in this submission and the revised PDD of the previous submission indicate the same completion date (i.e.01/07/2019) whereas different version number (2.4 vs 2.2) and different content (80 pages vs 94 pages). The DOE is requested to address the inconsistency and submitted the valid revised PDD with correct version number and completion date.
2: Page 32 (i.e. section 2.2 of the monitoring methodology) of AR-ACM0001 / Version 03 requires the targeted precision level for biomass estimation within each stratum is ±10% of the mean. However, the achieved precision of each stratum is not calculated and reported separately. The DOE is requested to provide information how it has verified the actual precision of each stratum.
3: Page 5 and page 32 of the applied methodology (AR-ACM0001 version 03) requires ex-post update of stratification due to forest management activities (e.g. harvesting). The updated planting/harvesting cycle (i.e. table 4 of the revised PDD) shows harvesting activities since 2015, and the verification report confirms the same. However, the verification report does not provide information on how those harvesting activities have been considered in ex-post stratification in line with the methodology requirements.
4: The spreadsheet containing information on how the tree biomass of the sampled plots was derived are NOT submitted. The DOE is requested to submit these spreadsheets and provide information on how it has verified the correctness of the tree biomass calculation.