Submission incomplete:
1: Scope: The verification and certification report does not describe the implementation status of the project as per VVS version 09.0 paragraph 385 (a).
Scope: The verification report does not describe the reasons for the phased-implementation delay and/or does not present the expected implementation dates as per VVS version 09.0 paragraph 385 (a).
Issue: On page 2 of the verification and certification report it is stated that "The geographical coordinates of the dam and the powerhouse are east longitude 103.7808°and north latitude 33.6131° and east longitude 103.9206°and north latitude 33.5603° respectively." According to the locations thus cited, there is a distance of approx 14 km between the locations of the dam and the powerhouse. Some mention of this distance should have made the description more transparent.

2: Scope: The verification and certification report does not provide a description of the actual operation of the project activity as per VVS version 09.0 paragraph 385 (b).
Issue: The verification and certification report states on page 9 that "The control system at the power plant is automated and assures continuous operation, including monitoring on malfunction of equipment. By checking the daily operation logs /8/, CTI can confirm that no serious malfunction happened and the plant was under a normal operation as expected in this monitoring period." However, in the spreadhsheet it is shown that for one month period (26/08/2013-25/09/2013) no electricity was generated. The two stated facts are not consistent. Some description for this gap in operation of the plant should have been provided.