1: Scope: The monitoring report does not contain information on calibration of monitoring instruments (frequency, relevant dates of calibration and/or validity) as specified by the monitoring methodology and the monitoring plan. (EB48 - Annex 68 paragraph 10 (a) (iv) & EB 54 Annex 34)
Issue:The monitoring report should contain information on calibration of all Hi-Flow Samplers used for measurement of leak rate; in particular dates, validity and result of and person/entity responsible for calibration of each Hi-Flow Sampler.

2: Scope: The verification report does not indicate that the information provided in the monitoring report has been cross-checked with other sources such as plant log books, inventories, purchase records, laboratory analyses. (VVM v.1.2 para 208 (a) and (b))
Issue:The DOE is requested to provide information on how the 121 sample points were randomly selected for the field inspection and desk review analysis, i.e. the method used to randomly select the 121 sample points out of the 22748 repaired leaks.

3: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan? (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue:The DOE is requested to provide verified information on calibration of all Hi-Flow Samplers used for measurement of leak rate; in particular dates, validity and result of and person/entity responsible for calibration of each Hi-Flow Sampler.