Info Report Check
Submission incomplete:
1: Scope: The verification report does not determine that calculations of baseline emissions, project emissions and leakage as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
Issue: In particular, the verification report does not provide an assessment on why: (a) in the calculation of the baseline emissions the volume of biogas used in the heating equipment has been calculated as the volume of biogas entering the boiler, and does not include the volumes of biogas of stack gases 1, 2 and 3 entering the coal fired boilers and; (b) emissions from flaring have not been accounted for.
2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: In particular, no validation opinion is provided for the calibration requirements of the spectrophotometer used for determining COD concentration of waste flows from and into the outlet.
1: Scope: The verification report does not determine that calculations of baseline emissions, project emissions and leakage as appropriate have been carried out in accordance with the formulae and methods described in the monitoring plan and the applied methodology document. (VVM v.1.2 para 208 (c) & 221 (h))
Issue: In particular, the verification report does not provide an assessment on why: (a) in the calculation of the baseline emissions the volume of biogas used in the heating equipment has been calculated as the volume of biogas entering the boiler, and does not include the volumes of biogas of stack gases 1, 2 and 3 entering the coal fired boilers and; (b) emissions from flaring have not been accounted for.
2: Scope: The verification report does not provide an assessment on whether the calibration of measuring equipments was conducted at a frequency specified in applied monitoring methodology or EB guidance if applicable, and/or the monitoring plan (VVM v.1.2 para 184 (a) (ii) & EB 52 Annex 60)
Issue: In particular, no validation opinion is provided for the calibration requirements of the spectrophotometer used for determining COD concentration of waste flows from and into the outlet.