Info Report Check
Submission incomplete:
The project participants shall describe the monitoring system and provide line diagrams (graphical schemes) showing all relevant monitoring points (PS-PA ver.01 paragraph 259).


The verification report (Section E.3) mentions that a line diagram showing the relevant metering points is provided in Section C of the MR. However, the line diagram (showing the relevant monitoring points) has not been provided on the MR.