Submission incomplete:
1: It is noted that CL 01 (VCR page 18) was closed in relation to missing calibration records. However, in Section E.7. of the VCR, page 11, the records are still missing. Calibration records are also missing in the MR. Please provide them.


2: According to the VCR, page 11, “The net electricity supplied to the grid by the project activity EG BL,y is calculated separately since the project activity is spread across three different sites, therefore the PLF for each site is calculated separately. Hence, the PP has calculated the net electricity generation for each site separately”. However, such separate calculations of net electricity and PLF do not appear on the ER calculation sheet. Please provide them accordingly.


3: The DOE is requested to revise the whole ER calculations file ensuring that all the spreadsheets are traceable, for example:

- Tab “Final sheet (2)”:
o The yearly totals are not traceable. There is not a formula for the sum of all the months in a year (cells H109 to K109).
o The values in the column “J” (NET IMP) are not traceable: The difference between IMP (column H) and EXP (column I) resulting in NET IMP (column J) is not traceable.
o The value “UNITS” (column K) is not traceable. Please clarify what it represents.

- Tab “Sheet 1”
o The titles of columns K and N are “@”. Please clarify what the values in these columns are and ensure their traceability.
o Please ensure the traceability of all the values in column R. The value in cell R833 has a different origin from R384 and R387.

- It is not possible to trace the formula provided on page 7 of the MR to calculate the net electricity generation from each WTG. Please reflect this formula in the spreadsheet ensuring traceability.