05:59 22 Dec 24
Info Report Check
Submission incomplete:
The DOE shall list each parameter required by the registered monitoring plan and state how it verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring report.
VVS version 3.0; paragraph 364
The DOE shall list each parameter required by the registered monitoring plan and state how it verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring report.
VVS version 3.0; paragraph 364
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: