19:46 25 Jan 25
Info Report Check
Submission incomplete:
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: The DOE mentions in the verification report that the meters have been installed in accordance with the registered PDD. However, it has not explained the difference in the accuracy class of meter measuring parameter EGimport,y. The PDD prescribes the accuracy of the meter as 0.5s., whereas the Monitoring Report page 7 reports the accuracy as 0.5 for meter M2.
Scope: The verification report does not state that the monitoring has been carried out in accordance with registered or the accepted revised monitoring plan. (VVM v.1.2 para 206 & 221(d))
Issue: The DOE mentions in the verification report that the meters have been installed in accordance with the registered PDD. However, it has not explained the difference in the accuracy class of meter measuring parameter EGimport,y. The PDD prescribes the accuracy of the meter as 0.5s., whereas the Monitoring Report page 7 reports the accuracy as 0.5 for meter M2.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: