Submission incomplete:
Scope: The verification report does not provide an assessment that all physical features of the proposed CDM project activity proposed in the registered PDD are in place and/or that the project participant has implemented and operated the proposed CDM project activity as per the registered PDD or the approved revised PDD. (VVM v.1.2 para 196)
Issue: In the verification report the DOE confirms that it verified through the equipments' nameplates that all physical features of the project have been implemented as per PDD, however there is an inconsistency between the generator model indicated in the monitoring report (SF15-32/5720) and in the verification report (SF15-32/5730).