Info Report Check
Submission incomplete:
In DOE’s response, the PP states the correct equation as CF/1000 * [EXPln(a) + b*ln(D)]. However, the actual equation applied is CF/1000 * EXP [ln(a) + b*ln(D)]. E.g. cell N4 of tab “Tree Biomass” of the ER sheet. As well, the equation described in cell E2 of tab “Standard Values shall be corrected accordingly.