Submission incomplete:
Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The DOE shall clarify how it has verified the parameters, Biogas Flow Rate and Biogas burned (BGburnt) to be in line with the registered monitoring plan given that the PLC control system for Sitio I stopped working during the period from 21 April 2011 to 16 May 2011 and the same was replaced by the PLC of Nest I; however, the DOE has not confirmed how the flow meter located at Nest I functioned without the PLC control system and this situation did not affect the data accuracy.
Scope: The verification report does not list each parameter required by the monitoring plan and does not provide an statement on how the DOE verified the information flow (from data generation, aggregation, to recording, calculation and reporting) for these parameters including the values in the monitoring reports (VVS v2, para 236, 284 (e)).
Issue: The DOE shall clarify how it has verified the parameters, Biogas Flow Rate and Biogas burned (BGburnt) to be in line with the registered monitoring plan given that the PLC control system for Sitio I stopped working during the period from 21 April 2011 to 16 May 2011 and the same was replaced by the PLC of Nest I; however, the DOE has not confirmed how the flow meter located at Nest I functioned without the PLC control system and this situation did not affect the data accuracy.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: