Submission incomplete:
Scope: The spreadsheet does not contain the formulae of calculation that are shown in the spreadsheet cells whenever possible. (EB48 - Annex 68 paragraph 10 (b) (ii)).
Issue: According to the monitoring report (p27), there were time period when measurements of NAP for plant N2 are outside of valid calibration period. Correction had been done in line with EB52 Annex60. There were also period of time when NAP measurement for plant N1 was not available at all (p25-26 of MR). NAP value was calculated based on other process data. These calculation /correction processes were not included in the spreadsheet. Given the impact of these parameters on the CERs, please transparently present how these "conservative correction factors" and calculations have been applied in the calculation process.
Scope: The spreadsheet does not contain the formulae of calculation that are shown in the spreadsheet cells whenever possible. (EB48 - Annex 68 paragraph 10 (b) (ii)).
Issue: According to the monitoring report (p27), there were time period when measurements of NAP for plant N2 are outside of valid calibration period. Correction had been done in line with EB52 Annex60. There were also period of time when NAP measurement for plant N1 was not available at all (p25-26 of MR). NAP value was calculated based on other process data. These calculation /correction processes were not included in the spreadsheet. Given the impact of these parameters on the CERs, please transparently present how these "conservative correction factors" and calculations have been applied in the calculation process.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: