Info Report Check
Submission incomplete:
1: VVS-PA Para 356(b)
As per page 2 of the monitoring report, the commercial operation start date of the project is 29/05/2013, however, as per the verification report, the date is 23/08/2012. The DOE shall clarify on this inconsistency and explain how it has verified the start date of operation. Refer Para 356(b) of VVS-PA version 3.0.
2: VVS-PA Para 361(e)
As per the registered PDD, for parameter FCdiesel,y, the data estimated based on the operational hours will be verified with the diesel purchase receipts. However, no information on this cross-check has been provided in the monitoring report or the verification report. The DOE is therefore requested to explain how it has verified that quality assurance and quality control procedures have been applied in accordance with the registered monitoring plan. Refer Para 361(e) of VVS-PA version 3.0.
1: VVS-PA Para 356(b)
As per page 2 of the monitoring report, the commercial operation start date of the project is 29/05/2013, however, as per the verification report, the date is 23/08/2012. The DOE shall clarify on this inconsistency and explain how it has verified the start date of operation. Refer Para 356(b) of VVS-PA version 3.0.
2: VVS-PA Para 361(e)
As per the registered PDD, for parameter FCdiesel,y, the data estimated based on the operational hours will be verified with the diesel purchase receipts. However, no information on this cross-check has been provided in the monitoring report or the verification report. The DOE is therefore requested to explain how it has verified that quality assurance and quality control procedures have been applied in accordance with the registered monitoring plan. Refer Para 361(e) of VVS-PA version 3.0.