Info Report Check
Submission incomplete:
1: The DOE (p 20) states that "Meters installed at separate at WTG and solar plant, the accuracy class -0.2s and calibration frequency of meters is once in five years, however, there is no delay in calibration of energy meters." However, "Sonu Handicrafts_Wind" sheet in the submitted spreadsheet shows and states that "Error Factor 0.2% has been applied due to delay in calibration from 01-Apr-2017 to 08-Jun-2019." The DOE is required to provide further information on this discrepancy between the verification report and the submitted spreadsheet.


2: The DOE states that the site visit cannot be postponed since a delay on performing the mandatory on-site visit for the project activity, will impact a delay in CERs delivery to its Annex-1 party, as there is an ERPA in place, signed in between the parties. However, the ERPA referred in the Appendix 3 of the verification report did not contain the date. The DOE is require to provide further information on timeline as per CER delivery commitment in the ERPA as per 26(b) of EB106 meeting report.