Info Report Check
Submission incomplete:
Scope: The verification report does not indicate that the information provided in the monitoring report has been cross-checked with other sources such as plant log books, inventories, purchase records, laboratory analyses. (VVS v2, para 246 (b))
Issue:
The DOE shall clarify how it has verified the parameter "EGfacility,y: Quantity of net electricity generation supplied by the project plant/unit to the grid in year y" in line with the requirements of the RMP and the methodology, given that, as per the RMP and the applied methodology, the Quantity of net electricity generation supplied by the project plant/unit to the grid in year y shall be cross checked with sales receipts. In doing so, the DOE is required to clarify whether CCEE report used for cross check includes the sales receipts, given that the link provided in the Verification Report is not accesible.