01:00 12 Jan 25
Info Report Check
Submission incomplete:
Scope: The verification report does not describe the reasons for the phased-implementation delay and/or does not present the expected implementation dates. (VVM v.1.2 para 198 (a)).
Issue: the Verification Report explains, on page 13, that the GEG was not yet installed and it is expected to be examined in a later phase. However, no explanations were provided on the reasons for the delay in the implementation of the engine.
Scope: The verification report does not describe the reasons for the phased-implementation delay and/or does not present the expected implementation dates. (VVM v.1.2 para 198 (a)).
Issue: the Verification Report explains, on page 13, that the GEG was not yet installed and it is expected to be examined in a later phase. However, no explanations were provided on the reasons for the delay in the implementation of the engine.
Offset now: visit the United Nations Carbon Offset Platform