Submission incomplete:
The DOE stated that if there is delayed calibration (of any meters), the PP conservatively applied zero for electricity generation in ER calculation during the delayed calibration period. The DOE is requested to provide spreadsheet that shows the application of zero electricity generation during delayed calibration period for meters with delayed calibration. Refer to paragraphs 364 and 365 of VVS-PA (version 02.0).