Info Report Check
Submission incomplete:
VVS-PA Para 361 (e)
As per the registered PDD, the net electricity generated will be cross-checked with electricity sales receipts obtained from the grid operator. As per the verification report, the net electricity generation is cross checked with the records of sold electricity available on SIC website.
For December 2019, the DOE/PP shall provide information on whether the value available on SIC website is for the full month or for only 19 days considered under the current monitoring period. If the SIC website value is for the full month of December, the DOE/PP shall clarify how the measured values for period of 1 – 19 December 2019 have been appropriately cross-checked in line with the procedures provided in the registered PDD considering the SIC website value does not cover the same number of days. Refer VVS-PA Para 361(e)
VVS-PA Para 361 (e)
As per the registered PDD, the net electricity generated will be cross-checked with electricity sales receipts obtained from the grid operator. As per the verification report, the net electricity generation is cross checked with the records of sold electricity available on SIC website.
For December 2019, the DOE/PP shall provide information on whether the value available on SIC website is for the full month or for only 19 days considered under the current monitoring period. If the SIC website value is for the full month of December, the DOE/PP shall clarify how the measured values for period of 1 – 19 December 2019 have been appropriately cross-checked in line with the procedures provided in the registered PDD considering the SIC website value does not cover the same number of days. Refer VVS-PA Para 361(e)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: