Completeness Check
Submission incomplete:
The PP/ DOE are requested to apply a valid version of the methodology as required by paragraph 9(f) of EB 48 Annex 60. The methodology applied is expired.
The methodolgy applied (AMS-I.C. ver 17 ) is expired. The PP/ DOE are requested to apply a valid version of the methodology.