Completeness Check
Submission incomplete:
1.On 1 April 2015, version 09.0 of the "CDM project standard" (PS), "CDM validation and verification standard" (VVS) and "CDM project cycle procedure" (PCP) enters into force.
At the time of re-submission, the DOE is kindly requested to submit the revised signed form applying the latest approved version of the related form "CDM project activity registration request form". Kindly refer to "Major revisions to the regulatory documents" available at: https://cdm.unfccc.int/Reference/index.html

2.On 1 April 2015, version 09.0 of the "CDM project standard" (PS), "CDM validation and verification standard" (VVS) and "CDM project cycle procedure" (PCP) enters into force.
At the time of re-submission, the DOE is kindly requested to submit the revised PDD applying the latest approved version of the related form for "CDM-PDD -FORM". Kindly refer to "Major revisions to the regulatory documents" available at: https://cdm.unfccc.int/Reference/index.html

3.The methodology applied is expired. The PP/ DOE are requested to apply a valid version of the methodology/ies as required by PS version 1 paragraph 35.
The applied version 13 of the methodology "ACM0002" is no longer valid. The DOE is kindly requested to update this request for registration using the latest version of methodology "ACM0002". Please be informed that the proof of payment was not provided within the grace period before expiration of the version '13' of the methodology "ACM0002" as per PCP, version 04.0, paragraph 59: "The project participants or the coordinating/managing entity shall pay the registration fee by bank transfer, quoting the unique reference number. The DOE shall submit proof of payment (e.g. bank transfer record) through a dedicated interface on the UNFCCC CDM website. If the proposed project activity or PoA applies a methodology that has been revised, withdrawn, or suspended by the Board, either proof of payment must be uploaded within 20 days or payment must be received within 40 days of the end of the grace period for revision or the date of withdrawal or suspension, as defined in the procedure “Development, revision and clarification of baseline and monitoring methodologies and methodological tools”."

4.The DOE is requested to address inconsistencies in the project participants details accordingly.
The Letter of Approval issued by the host party Iran (Islamic Republic of), signed on 16 July, 2013 states the name of the project participant "The Iranian Water and Power Development Company". However, the project view page and submitted PDD, version 09, dated 25 November, 2013, both display the name "Iran Water and Power Development Company". The DOE is kindly requested to address the above mentioned inconsistency by providing an Addendum expedite by the host party " Iran (Islamic Republic of)" (DNA) confirming the change of name of this entity.