Completeness Check
Submission incomplete:
1.The PP/DOE are requested to upload the respective PDD to the project view page as requested by paragraph 8 (a) of EB 48 Annex 60.
See Annex 2: the UNFCCC logo and page numbering are not right aligned (minor issue).

2.The DOE is requested to upload the respective validation report to the project view page as requested by paragraph 8 (b) of EB 48 Annex 60.
Inside cover page confirms the report has 119 pages. Only 106 pages have been submitted.

3.The DOE is requested to merge the letters of approval/authorization (LoA) issued by the same county and upload as one file.
The LoA from the UK for Noble Carbon Ltd is not submitted nor is it merged with the LoA for Climate Bridge Ltd.

4.The following document contains missing information:
Validation report: It is not possible to determine whether Table 3-1 is complete. From page 31 to page 53 it appears that the column 'final conclusion' is missing from the table.