Completeness Check
Submission incomplete:
1.Please be informed that the monitoring report as well as the verification/certification report refer to a temporary deviation as per para 228 (b), (i) of the PS-PoA version 2.0. As per para 169 and 172 of PCP-PoA, temporary deviation need to be described in the monitoring report and can be submitted along with issuance track, along with CDM-PRCV-FORM as well as CDM-CPA-PRCV-FORM need to be submitted.
As issuance request is not clubbed with valid PRC, secretariat will mark this submission incomplete. Once re-submission is made, secretariat will process the request further.


2.There is an inconsistency in the type of PRC changes. The verification/certification report refers on section E.3.2.3. to approved changes of the crediting period whereas section C.3.3 of the monitoring report does not refer to the approved changes .


3.According to PCP for Project Activities version 1.0, para 196, a valid version of the CDM-MR-FORM shall be submitted.
The submitted monitoring report template is version 03.0 which is no longer valid. Kindly send us a revised report using the latest form valid at time of submission (version 04.0, valid as of 6 April 2021).

4.There is an inconsistency in the cross referencing of the CPA title. The CPA titles referred to in the verification and certification report (pages 10, 23 and 24) is not complete and does not correspond to the correct titles referred to in the monitoring report as well as the CPA view page.



5.There is an inconsistency of the inclusion date. The verification/certification report refers on page 10 to inclusion date as 23/01/2013 whereas CPA 9507-P1-0001-CP1 was included on 28/01/2013.